IEEE S2
Present
(P) or Not Present (NP):
|
P |
Paul Croll |
S2 |
|
P |
Annette Reilly |
Management Board, 15289 WG Chair |
|
P |
Carl Singer |
Management Board |
|
P |
Chuck Walrad |
S2 |
|
P |
Dave Schultz |
Vice Chair, Operations & Mgt Board Chair |
|
NP |
Dennis Lawrence |
S2 |
|
P |
David Phillips |
Chair, |
|
P |
Jim Moore |
Vice Chair, International Operations and Liaison to |
|
NP |
Joe Jarzombek |
DHS Liaison |
|
NP |
John Walz |
Vice Chair, |
|
NP |
Keith Middleton |
Management Board |
|
NP |
Ken Costello |
Management Board |
|
P |
Lou Gullo |
Reliability Society liaison, AudCom member, also Std Chair working group P1633 & P1624 |
|
NP |
Mark Henley |
Chair, |
|
NP |
Mary Beth Chrissis |
SEI Liaison |
|
P |
Malia Zaman |
Program
Manager, IEEE-SA S2 |
|
NP |
Markus Plessel |
IEEE staff – Marketing |
|
NP |
Randy Case |
Head of INCOSE Standards Cmte (S2 |
|
P |
Elliot Sloane |
HITSP liaison, |
|
NP |
Susan Tatiner |
Director, Standards Publishing Programs, IEEE SA |
|
P |
Todd Cooper |
Chair of IEEE 11073 Standards activities |
Call to order:
Announcements
None.
1. Standards Status Report [M. Zaman/ D. Schultz]
·
See attached standards
balloting activity report from Malia Zaman
·
See attached WG report
from Dave Schultz.
·
1042 will need to be
re-affirmed, since the new
·
AR: Croll needs to add
Paul Diamond and Pekka as WG chairs for MyProject.
·
AR: Croll to contact Dave
Zubrow to see if he would be willing to be WG chair for 982.1 (SW Reliability
Metrics). Gullo to contact Kadir Demir
about participating in the WG.
·
AR: Singer to inform
Pekka Abrahamson that it is not appropriate to include the Agile Manifesto in
an IEEE standard. It could, however, be
referenced in the standard, and easily included in a bibliography. Singer to convey to Abrahamson that we would
like to see the proposed schedule accelerated, so that a draft could be
balloted in December.
3. Medical
Informatics [ Sloane ]
·
Sloane is putting
together a medical informatics conference. Croll is working with him. This is
in the very early planning stages.
·
AR: Walrad to send draft
of FP -06 to Sloane to provide an overview of the S2
·
AR: Croll, Walrad and Sloan, and Cooper to have a
telecon
AR: Gullo to work with Sloane on establishing a Reliability Society liaison
for the conference.
4. S2
·
Croll pointed us to the
beta site at www2.computer.org/portal/web/sehome. The new portal tools will enable us to spread
editing responsibilities amongst the S2
AR:
5. Contributions to SSTC 2009
·
Croll gave us a heads up
about the need to start planning for our contributions to this conference. Abstracts are due Sept.
19. See www.sstc-online.org. Croll asked for our ideas
for an S2
Next Telecons:
Instructions for Telecon:
at
[1]
This group does not create standards, but act as SMEs
in the systems standards
area, becoming heavily involved in the development of standards
by